Hebi Wanfeng Mining Machinery Manufacturing Co., Ltd.
No. 01, Northeast Corner of the Intersection of Heqi Avenue and Weishi Road, Urban-Rural Integration Demonstration Area, Hebi City, Henan Province
+86 138 3921 6889
+86 138 3921 2896
24×7 hour online service
ODM/OEM Manufacturer
Ask for more details from the seller
Contact Supplier
Products
Sinking platform Mining

Sinking platform Mining


Product Image
Product Introduction
Technical Specifications
Application
Product Details
Product Image
Sinking platform Mining
Sinking platform Mining
Sinking platform Mining
Sinking platform Mining
Sinking platform Mining
Sinking platform Mining
Product Introduction

Sinking stage: Shaft construction support, equipment installation, personnel work core platform. Double multi-layer steel structure layout. Steel wire rope suspension lifting lowering. I-beam main beams, channel steel secondary beams, anti-slip steel plates equipped. Floor spacing 4-6 meters. 
Compatible rock grab, horizontal pump installation. 
Core tasks: shaft wall lining, bolt mounting, guide beam positioning. Worker operation platform, equipment transport passage integrated function.

Applicable coal mine metal mine various shaft projects. Covers excavation, shaft lining deep freezing shaft complex section, guide beam permanent installation key stages. 

Structural Features & Working Principle

Core frame: I-beam + channel steel primary/secondary beams. Form robust double/multi-layer steel structure.

Work platform: Anti-slip steel plates. Standard floor height 4-6m. Inter-layer passages.

Modern design: Multi-functional integrated layer. Centralized layout of construction equipment, pipelines.

Traditional mode (suspended): Winch-driven. Steel wire rope lifting/lowering.

Advanced mode (walking type): Hydraulic cylinder drive. Alternate "stepping" on shaft wall. Self-lifting, self-stabilizing.

Key device (fixator): Lateral elastic wheels press shaft wall. Quick fine-tuning, active stabilization. Protect shaft wall. Adapt complex conditions.

Core progress: Modern stage with integrated design (walking type + fixator). Boost deep shaft construction efficiency, safety.

Full-cycle core platform: For all shaft construction stages (excavation, lining, installation). Indispensable in deep freezing shaft complex sections, simultaneous operations.


Backup_of_矿机画册(最终确定版.jpg

Technical Specifications
Drilling Rig Technical Specifications Table
Suspension platform
diameter(m)
Number of
floors
Interlayer spacing(m)Number of support columns(units)Number of fixtures
per layer(pieces)
3.5-122-34-64-84-8


Customer Site
Product Details
凿井吊盘.jpg

To date, Wanfeng Winch company has cumulatively obtained over 400+qualifications, honors, patents, etc.

Get Exclusive Plan | Free Design

📞wechat/whatsAPP:+86 138 3921 2896

🌐Chinese website: www.hbwfks.com
🌐English website: www.mininghoist.com   www.hbwfks.cn/ 

🌐French website: www.miningwinch.com

🌐Spanish website: www.wf-cn.com

🌐Russian website:www.shaftsinkingwinch.com

🌐Arabic website:www.winchhoist.com

Leave a Message
Contact us
Phone
Whatsapp
Email
Inquiry
WeChat
Page up