Position: Home > Products > Mining Headframe > Details
Hebi Wanfeng Mining Machinery Manufacturing Co., Ltd.
No. 01, Northeast Corner of the Intersection of Heqi Avenue and Weishi Road, Urban-Rural Integration Demonstration Area, Hebi City, Henan Province
+86 138 3921 6889
+86 138 3921 2896
24×7 hour online service
ODM/OEM Manufacturer
Ask for more details from the seller
Contact Supplier
Products
Mining Shaft Sinking Tower

Mining Shaft Sinking Tower


Product Image
Product Introduction
Technical Specifications
Application
Product Details
Product Image
Mining Shaft Sinking Tower
Mining Shaft Sinking Tower
Mining Shaft Sinking Tower
Mining Shaft Sinking Tower
Mining Shaft Sinking Tower
Mining Shaft Sinking Tower
Product Introduction

Shaft sinking headframes are mainly fabricated welding or bolting steel pipes, section steels, etc. The headframe consists of several parts: sheave house, sheave platform, main truss, tipping platform, access ladders, and foundation.

Meets construction and process requirements of vertical shafts with varying diameters and depths. While meeting strength, rigidity and stability criteria, the headframe features rational structure, easy fabrication, and convenient transportation, installation and disassembly. It can be flexibly configured per different shaft diameters, depths and process needs, offering a reliable high-altitude operation and load transmission platform for shaft sinking.

Structure Features & Working Principle:

Modular Design: Standardized steel structure, bolted connections for quick disassembly and reuse.

Clear Load Transmission: 

○ Vertical Load: Sheave → Sheave Platform → Main Truss → Foundation → Ground

Horizontal Load: Transferred and distributed via space truss and bracing system

○ Sheave Platform: Central control hub for hoisting and suspension systems

Tipping Platform: Muck transfer area

Open Well Center: Unobstructed passage large equipment

High Adaptability: Customized design for heavy equipment (shaft boring machines) and special construction methods (freezing method, drilling method, etc.).

System Positioning: Integrates hoisting, suspension, transfer, and protection functions, serving as a key support system for safe and rapid vertical shaft construction.

Specialized for Shaft Sinking: Steel structure system designed exclusively mine shaft projects, combining high adaptability, efficiency, cost-effectiveness.

Modular assembly/disassembly: Bolted steel structure enables fast on-site assembly, disassembly, reuse, reducing time and costs.

Reliable Load Path: Vertical and horizontal loads are efficiently transmitted through trusses, platforms, and foundations for stable structural safety.


Technical Specifications
Especificaciones Técnicas del Castillete de Pozo de Hundimiento
NOModeloProfundidad Aplicable del PozoAltura desde la Cimentación hasta la Plataforma de la Rueda SuperiorSeparación entre Patas del CastilleteTamaño de la Plataforma de PoleasPeso


(m)(m)(m)(m)(t)
13.5-5.016.24210×105.5×5.525.09
24.5-6.017.250 12×126.0×6.030.62
35.0-6.517.34612×126.5×6.533.07
45.0-6.519.84612.83×12.836.5×6.539.47
56.0-8.021.970 14×147.0×7.049.39
66.0-8.025.870 15.3×15.37.0×7.058.54
78.0-9.026.36416×167.5×7.572.37
88.0-10.027.07817.55×17.559.05×9.05110.00 
910.0-14.029.200 21×2112×12215.22


Customer Site
Product Details

凿井井架.jpg

Leave a Message