Product Image





Product IntroductionThe sinking headframe is designed to serve dual purposes as the permanent headframe. During the mine design phase, the sinking headframe is designed and constructed in accordance with the standards for a permanent headframe. Upon completion of shaft construction, the headframe is not dismantled. Instead, it is directly converted for production use as the permanent headframe through necessary modifications and reinforcements.
| Main Advantages |
| ◎ Significant Cost Savings: Eliminates the substantial expenses associated with dismantling a temporary headframe and constructing a new permanent headframe (including material, labor, and heavy machinery costs). |
| ◎ Dramatic Reduction in Construction Time: Directly bypasses the construction cycle required for a new permanent headframe, enabling earlier mine commissioning and economic benefits. |
| ◎ Simplified Site Layout: Only one headframe system is needed in the shaft area during construction, resulting in a cleaner site, easier management, and reduced overlapping operations. |
| ◎ Reduced Material Consumption: Aligns with green and sustainable construction principles. |
Technical Specifications
Application
Product Details