Wanfeng Mining Machinery: Expert in Tunnel Hoisting Systems

Wanfeng Mining Machinery: Expert in Tunnel Hoisting Systems
For more information about this project
Please contact the manager
Bruce Lee(sales Manager)
Email: Bruce@wf-cn.com
WhatsApp: +86 138 3921 6889

For more information about this project
Please contact the manager
Serena Shang (sales Manager)
Email: id@wf-cn.com
WhatsApp: +86 138 3921 2896
Chat Online
Case Description

Wanfeng Mining Machinery: Expert in Tunnel Hoisting Systems

Wanfeng Machinery provides professional hoisting solutions for tunnel and underground engineering projects, offering a product range that includes JTK mining hoists and JZ series shaft sinking hoists to meet various construction requirements.

Core Products

1.  JTK Mining Hoist

 Modular compact design

 Suitable for confined construction spaces

 Maximum static tension 60-90kN

2.  JZ Shaft Sinking Hoist

 Double-drum design

 Supports bidirectional synchronous tunneling

 Intelligent depth indication (±5cm accuracy)

Technical Highlights

Dual-workface Tunneling System

 Adopts "midpoint access, bidirectional advance" technique

 Coordinated operation of main/auxiliary hoisting systems:

✓ Main hoist: 8m³ skip for muck removal

 ✓ Auxiliary hoist: Material transport40% efficiency improvement at Hubei Jinshan Mine

Intelligent Monitoring

 Real-time monitoring of wire rope tension, motor status, etc.

 5G remote diagnostics

Project Cases

1.  Zhengzhou Metro Project

 3 JTK hoists

 Daily transport capacity 1500m³

 Personnel transport efficiency +60%

2.  Hebei Pumped Storage Power Station

 JZP-16/1300 hoist

 Bidirectional tunneling shortened schedule by 30 days

3.  Shanxi Coal Mine Tunnel

 JTK+JZ combined system

 Completed 800m excavation

 8000 hours fault-free operation

Innovative Technologies

 Dual-machine synchronization control (error <0.1m/s)

 Wear-resistant system (liner life 50,000 cycles)

 Emergency braking (30-minute operation after power failure)

Wanfeng's fifth-generation intelligent system has achieved digital twin O&M, continuously advancing tunneling technology.

Prev: Currently the first article
Next: Currently the last article
relate projects
Phone
Whatsapp
Email
Inquiry
WeChat
Page up